Frame prepared to receive the pedalbox, the two lower patches will be drilled and threaded.
Strenghtening where the seatrails will be mounted (back there where the weight applies).
Rather than to bolt in a subframe, brackets for the diff breather and the low pressure fuel pump.
Just a little paint on some steel rails... but very important for me: the real start of the build-up.
From today on, the build-up begins. After the add of more brackets, the first coat of primer is on the front part of the chassis (2/3rd). The rear soon will get it's final sanding and primer, then the whole chassis will once again be rubbed with Scotchbrite. I will decide according to the result wether I will then put the chassis paint or a second layer of primer.
Cheers.
No comments:
Post a Comment